XENON TRANSIENT TESTS. CORE I, SEED 2, EFPH 1565.4. Section 1. Test Results T-612081
Tests were carried out to determine if there was sufficient excess reactivity present in the core to override a pesk xenon transient and to obtain data for rod worth calculations. Upon completion of 1565.4 EFPH of plant operation of Core I, Seed 2, there was sufficient reactivity to override the peak xenon transient imposed by a rapid shutdown from an average reactor power level of 102.65%. The override occurred 8 hr and 46 min after shutdown with Group I control rods withdrawn to 69 in. and Group II control rods controlling, withdrawn to 44.75 in. Rod Group III and Group IV were fully inserted. (M.C.G.)
- Research Organization:
- Duquesne Light Co., Shippingport, Penna.
- NSA Number:
- NSA-15-017830
- OSTI ID:
- 4030823
- Report Number(s):
- DLCS-1560109
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
Xenon Transient Tests: Core I, Seed 2, 149.8 EFPH: Section 1 - Test Results T-612081
XENON TRANSIENT, 761.3 EFPH. CORE I, SEED 2. Section 1. Test Results T- 612081
Test Results: DLCS 1560103 T-612061 Xenon Transient 2790.5 EFPH - Core I, Seed I
Technical Report
·
Tue Oct 25 00:00:00 EDT 1960
·
OSTI ID:4091338
XENON TRANSIENT, 761.3 EFPH. CORE I, SEED 2. Section 1. Test Results T- 612081
Technical Report
·
Wed Nov 30 23:00:00 EST 1960
·
OSTI ID:4065421
Test Results: DLCS 1560103 T-612061 Xenon Transient 2790.5 EFPH - Core I, Seed I
Technical Report
·
Wed Apr 26 23:00:00 EST 1961
·
OSTI ID:4073931