POWER REACTOR PROGRAM. Progress Report to Savannah River Operations Office, United States Atomic Energy Commission for the Period May 1, 1961 through May 31, 1961
Technical Report
·
OSTI ID:4014262
The successful extrusion of one copper-- nickel tube and one uranium- cored tube provided assurance that the proposed change in billet design wouid improve the quality of the outer tubes. As a result, a demonstration set of three unalloyed uranium tubes was extruded. Preliminary evaluation indicated that the tubes will meet all specifications. Two 1-in. diameter tubes were extruded for the study of the effect of restraint on fuel swelling. (auth)
- Research Organization:
- Nuclear Metals, Inc., Concord, Mass.
- NSA Number:
- NSA-15-025646
- OSTI ID:
- 4014262
- Report Number(s):
- NMI-7240
- Country of Publication:
- United States
- Language:
- English
Similar Records
POWER REACTOR PROGRAM. Progress Report to Savannah River Operations Office, United States Atomic Energy Commission, foR the period August 1, 1961 through August 31, 1961
POWER REACTOR PROGRAM. Progress Report to Savannah River Operations Office, United States Atomic Energy Commission for the Period June 1, 1961 through July 31, 1961
POWER REACTOR PROGRAM. PROGRESS REPORT TO SAVANNAH RIVER OPERATIONS OFFICE, UNITED STATES ATOMIC ENERGY COMMISSION FOR THE PERIOD MARCH 1, 1961 THROUGH MARCH 31, 1961
Technical Report
·
Sun Oct 01 00:00:00 EDT 1961
·
OSTI ID:4808913
POWER REACTOR PROGRAM. Progress Report to Savannah River Operations Office, United States Atomic Energy Commission for the Period June 1, 1961 through July 31, 1961
Technical Report
·
Thu Aug 24 00:00:00 EDT 1961
·
OSTI ID:4804925
POWER REACTOR PROGRAM. PROGRESS REPORT TO SAVANNAH RIVER OPERATIONS OFFICE, UNITED STATES ATOMIC ENERGY COMMISSION FOR THE PERIOD MARCH 1, 1961 THROUGH MARCH 31, 1961
Technical Report
·
Thu May 11 00:00:00 EDT 1961
·
OSTI ID:4050697