SOME PROBLEMS INVOLVED IN THE USE OF A 1000-Bev ACCELERATOR
Technical Report
·
OSTI ID:4011149
The problems related to induced radioactivity in the tunnels of high- energy accelerators are considered. Calculations indicated that in 1000-Bev accelerators the radioactivity especially around the target will be much above tolerance. Methods of minimizing maintenance and the use of remote handling equipment are discussed. Other discussions are presented on beam extraction and vacuum requirements. (J.R.D.)
- Research Organization:
- Brookhaven National Lab., Upton, N.Y.
- NSA Number:
- NSA-15-018867
- OSTI ID:
- 4011149
- Report Number(s):
- BNL-5423
- Country of Publication:
- United States
- Language:
- English
Similar Records
SCALING CALCULATIONS FOR A 1000-Bev ACCELERATOR
EXPERIMENTAL PROGRAM REQUIREMENTS FOR A 300 TO 1000-Bev ACCELERATOR. DESIGN STUDY FOR A 300 TO 1000-Bev ACCELERATOR
VACUUM SYSTEM FOR A 1000-Bev ACCELERATOR
Technical Report
·
Tue Jan 24 23:00:00 EST 1961
·
OSTI ID:4011980
EXPERIMENTAL PROGRAM REQUIREMENTS FOR A 300 TO 1000-Bev ACCELERATOR. DESIGN STUDY FOR A 300 TO 1000-Bev ACCELERATOR
Technical Report
·
Mon Aug 28 00:00:00 EDT 1961
·
OSTI ID:4728816
VACUUM SYSTEM FOR A 1000-Bev ACCELERATOR
Technical Report
·
Mon Feb 13 23:00:00 EST 1961
·
OSTI ID:4009450