Operation hardtack. Phase 2: Timing and firing. Report for April-October 1958
Technical Report
·
OSTI ID:377264
Edgerton, Germeshausen and Grier, Inc. (EGG) furnished timing and firing signals for the thirty-seven shots of Operation Hardtack, Phase II. Six independent timing systems were installed in the CP-l building and in five timing signal distribution stations at the Nevada Test Site. Signals from the sequence timers were distributed to experimenters and to zero sites by wire; voice-time announcements were transmitted to experimenters on radio frequencies. The world-time system was operated on surface, tower, and balloon shots and on certain of the underground detonations. Most of the above-ground shots were instrumented for Bhangmeter recording.
- Research Organization:
- EG and G, Inc., Wellesley, MA (United States)
- OSTI ID:
- 377264
- Report Number(s):
- AD-A--310345/4/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Operation plumbbob, report to the test director. Nevada Test Site, May-October 1957. Timing and firing. Sanitized version
Operation upshot-knothole, Nevada proving grounds. March-June 1953. Report to the test director. Timing and firing (sanitized version)
Timing and firing. Report for April-October 1958
Technical Report
·
Sun Jun 01 00:00:00 EDT 1958
·
OSTI ID:432722
Operation upshot-knothole, Nevada proving grounds. March-June 1953. Report to the test director. Timing and firing (sanitized version)
Technical Report
·
Sun Jan 31 23:00:00 EST 1954
·
OSTI ID:415949
Timing and firing. Report for April-October 1958
Technical Report
·
Mon Sep 14 00:00:00 EDT 1959
·
OSTI ID:5329866