Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

TWRS privatization phase I liquid effluent transfer systems engineering study

Technical Report ·
DOI:https://doi.org/10.2172/325661· OSTI ID:325661
The DOE-RL is pursuing a new business strategy of hiring private contractors for treatment of Hanford tank waste. This `privatization` initiative includes design, permitting, construction, operations, deactivation and decommissioning of tank waste treatment facilities. The TWRS Privatization Infrastructure Project is part of the first phase of the initiative. It consists of several sub-projects which will provide key physical interfaces and services needed to support the phase I mission. One sub-project is to provide transfer systems integrated with 200 Area liquid effluent facilities to service the private contractors. This study deals with transfer systems requirements, alternatives and identifies a preferred alternative.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
325661
Report Number(s):
WHC-SD-WM-ES--396; ON: DE98058563; BR: EWE313000
Country of Publication:
United States
Language:
English

Similar Records

Phase I privatization, liquid effluence transfer and roads design requirements document
Technical Report · Mon Sep 30 00:00:00 EDT 1996 · OSTI ID:332169

Engineering study TWRS privatization phase I roads and rail system modifications
Technical Report · Mon Sep 30 00:00:00 EDT 1996 · OSTI ID:328130

TWRS privatization phase I site development engineering study
Technical Report · Mon Sep 30 00:00:00 EDT 1996 · OSTI ID:328131