Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Engineering study TWRS privatization phase I roads and rail system modifications

Technical Report ·
DOI:https://doi.org/10.2172/328130· OSTI ID:328130
The DOE-RL is pursuing a new business strategy of hiring private contractors for treatment of Hanford Site tank wastes. This strategy is called privatization and includes design, permitting , construction, operation and deactivation of facilities for tank waste treatment. The TWRS Privatization Infrastructure Project is part of the first phase of the initiative. It consists of several sub-projects which will provide key physical interfaces and services needed to support the privatization mission. One sub-project is to establish transport system changes needed to support the privatization initiative. Specifically, this study identifies the road and rail system modifications needed to service the privatization site in 2OOE; an area previously developed and characterized for Grout Disposal.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
328130
Report Number(s):
WHC-SD-TWR-ES--004; ON: DE98058580; BR: EW3130000
Country of Publication:
United States
Language:
English

Similar Records

TWRS privatization Phase I site development design requirements document
Technical Report · Mon Jan 20 23:00:00 EST 1997 · OSTI ID:293382

TWRS privatization phase 1 master site plan
Technical Report · Mon Sep 30 00:00:00 EDT 1996 · OSTI ID:330732

TWRS privatization phase I site development engineering study
Technical Report · Mon Sep 30 00:00:00 EDT 1996 · OSTI ID:328131