Title: TWRS privatization Phase I site development design requirements document

Technical Report ·
DOI:https://doi.org/10.2172/293382· OSTI ID:293382

The DOE-RL is pursuing a strategy of hiring private contractors for treatment of Hanford Site tank wastes. This strategy is called privatization and includes design, permitting,construction, operation, and deactivation of facilities for tank waste treatment. The TWRS Privatization Infrastructure Project consists of several sub- projects which will provide key services needed to support the privatization mission. This document identifies the design requirements for the site development sub-project, including construction, power, water, and road modifications. It will be used in development of the project`s conceptual design.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
293382
Report Number(s):
HNF-SD-WM-DRD-013-Rev.1; ON: DE98059516; BR: EW3130000; TRN: 97000042
Resource Relation:
Other Information: PBD: 21 Jan 1997
Country of Publication:
United States
Language:
English

Similar Records

Engineering study TWRS privatization phase I roads and rail system modifications
Technical Report · Mon Sep 30 00:00:00 EDT 1996 · OSTI ID:293382

Phase I privatization, liquid effluence transfer and roads design requirements document
Technical Report · Mon Sep 30 00:00:00 EDT 1996 · OSTI ID:293382

TWRS privatization phase I site development engineering study
Technical Report · Mon Sep 30 00:00:00 EDT 1996 · OSTI ID:293382