Commissioning of the IOTA Proton Injector
- Fermilab
The Proton Injector for the IOTA storage ring (IPI) is being constructed at the Fermilab Accelerator Science and Technology facility (FAST). It will be a machine capable of delivering 20 mA pulses of protons at 2.5 MeV. IPI will operate alongside the existing electron injector beamline to facilitate further beam physics research and the continued development of novel accelerator technologies at the IOTA ring. This report details the results of the initial commissioning of IPI and an overview of the upcoming experiments with intense proton beams at IOTA.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- Contributing Organization:
- IOTA
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 2396939
- Report Number(s):
- FERMILAB-POSTER-24-0071-AD; oai:inspirehep.net:2803417
- Country of Publication:
- United States
- Language:
- English
Similar Records
Status of the IOTA Proton Injector
Status of the IOTA proton injector
IOTA Proton Injector Beamline Installation
Conference
·
Fri Oct 20 00:00:00 EDT 2023
·
OSTI ID:2203115
Status of the IOTA proton injector
Conference
·
Wed Jan 31 23:00:00 EST 2024
·
OSTI ID:2283686
IOTA Proton Injector Beamline Installation
Conference
·
Tue May 16 00:00:00 EDT 2023
·
OSTI ID:1974697