Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

IOTA Proton Injector Beamline Installation

Conference ·
OSTI ID:1974697
The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility, is a beamline capable of delivering 20-mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in 2023, when it will operate alongside the existing electron injector beamline to facilitate further fundamental physics research and continued development of novel accelerator technologies in the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1974697
Report Number(s):
FERMILAB-CONF-23-178-AD; arXiv:2305.09830; oai:inspirehep.net:2660676
Country of Publication:
United States
Language:
English

Similar Records

Status of the IOTA Proton Injector
Conference · Fri Oct 20 00:00:00 EDT 2023 · OSTI ID:2203115

Status of the IOTA proton injector
Conference · Wed Jan 31 23:00:00 EST 2024 · OSTI ID:2283686

Commissioning of the IOTA Proton Injector
Conference · Mon Jul 01 00:00:00 EDT 2024 · OSTI ID:2396939

Related Subjects