Status of the IOTA Proton Injector
Conference
·
OSTI ID:2203115
- Fermilab
The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility (FAST), is a machine capable of delivering 20 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in the first half of 2024, when it will operate alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 2203115
- Report Number(s):
- FERMILAB-CONF-23-568-AD; arXiv:2310.13520; oai:inspirehep.net:2713175
- Country of Publication:
- United States
- Language:
- English
Similar Records
Status of the IOTA proton injector
IOTA Proton Injector Beamline Installation
Commissioning of the IOTA Proton Injector
Conference
·
Wed Jan 31 23:00:00 EST 2024
·
OSTI ID:2283686
IOTA Proton Injector Beamline Installation
Conference
·
Tue May 16 00:00:00 EDT 2023
·
OSTI ID:1974697
Commissioning of the IOTA Proton Injector
Conference
·
Mon Jul 01 00:00:00 EDT 2024
·
OSTI ID:2396939