Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Analysis of failure modes resulting in stress corrosion cracking of 304N tubing in a high pressure heater desuperheater

Conference ·
OSTI ID:207778
;  [1];  [2]
  1. Santee Cooper, Georgetown, SC (United States)
  2. Powerfect, Inc., Livingston, NJ (United States)
Santee Cooper (South Carolina Public Service Authority) experienced twenty-three tube failures in a high pressure feedwater heater that was in service less than three years. The tube failures were located at baffles adjacent to both exits of the dual flow desuperheater. Metallurgical analysis of the failed tubes indicated that stress corrosion cracking of the 304N stainless steel was the primary failure mode. The investigation to determine the factors leading to the onset of stress corrosion cracking included analysis of heater acceptance tests, the heater manufacturer`s proposal and manufacturing procedures, operational data, eddy current reports, metallurgical reports, and a heater design review for vibration and wet wall potential (formation of condensation on the outside diameter (OD) of the tube prior to the desuperheater exit).
OSTI ID:
207778
Report Number(s):
CONF-951010--; ISBN 0-7918-1488-2
Country of Publication:
United States
Language:
English

Similar Records

Analysis of failure modes resulting in stress corrosion cracking of 304N tubing in a high pressure heater desuperheater
Journal Article · Thu Oct 01 00:00:00 EDT 1998 · Journal of Engineering for Gas Turbines and Power · OSTI ID:316157

Stress corrosion cracking of Ni-Cu alloy 400 tubes in feedwater heaters
Conference · Fri Dec 30 23:00:00 EST 1994 · OSTI ID:78283

Alloy 400 tube failures by stress corrosion cracking
Technical Report · Thu Nov 30 23:00:00 EST 1995 · OSTI ID:227013