Experience with Long-Pulse Operation of the PIP2IT Warm Front End
Conference
·
OSTI ID:1565925
- Fermilab
- Michigan State U.
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- Contributing Organization:
- PIP-II
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1565925
- Report Number(s):
- FERMILAB-CONF-19-439-AD; oai:inspirehep.net:1755019
- Resource Relation:
- Conference: 3rd North American Particle Accelerator Conference (NAPAC2019), Lansing, Michigan, 09/01-09/06/2019
- Country of Publication:
- United States
- Language:
- English
Similar Records
Beam Optics Measurements in Medium Energy Beam Transport at PIP-II Injector Test Facility
Experimental Study of Beam Dynamics in the PIP-II MEBT Prototype
Status of the Warm Front End of PIP-II Injector Test
Conference
·
Fri Jun 01 00:00:00 EDT 2018
·
OSTI ID:1565925
+3 more
Experimental Study of Beam Dynamics in the PIP-II MEBT Prototype
Conference
·
Mon Jan 01 00:00:00 EST 2018
·
OSTI ID:1565925
+6 more
Status of the Warm Front End of PIP-II Injector Test
Conference
·
Mon May 01 00:00:00 EDT 2017
·
OSTI ID:1565925
+15 more