Status of the Warm Front End of PIP-II Injector Test
- Fermilab
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H⁻ SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test is under construction. It includes a 10 mA DC, 30 keV H⁻ ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1412511
- Report Number(s):
- FERMILAB-CONF-17-146-AD; 1627051
- Resource Relation:
- Conference: 8th International Particle Accelerator Conference, Copenhagen, Denmark, 05/14-05/19/2017
- Country of Publication:
- United States
- Language:
- English
Similar Records
Beam Dynamics Studies at the PIP-II Injector Test Facility
PIP-II Injector Test Warm Front End: Commissioning Update