PRELIMINARY TEST RESULTS OF A PROTOTYPE FAST KICKER FOR APS MBA UPGRADE
The APS multi-bend achromatic (MBA) upgrade storage ring plans to support two bunch fill patterns: a 48-bunch and a 324-bunch. A “swap out” injection scheme is required. In order to provide the required kick to injected beam, to minimize the beam loss and residual oscillation of injected beam, and to minimize the perturbation to stored beam during injection, the rise, fall, and flat-top parts of the kicker pulse must be within a 16.9-ns interval. Stripline-type kickers are chosen for both injection and extraction. We developed a prototype kicker that supports a ±15kV differential pulse voltage. We performed high voltage discharge, TDR measurement, high voltage pulse test and beam test of the kicker. We report the final design of the fast kicker and the test results.
- Research Organization:
- Argonne National Laboratory (ANL)
- Sponsoring Organization:
- USDOE Office of Science
- DOE Contract Number:
- AC02-06CH11357
- OSTI ID:
- 1389059
- Country of Publication:
- United States
- Language:
- English
Similar Records
SIMULATION STUDIES OF A PROTOTYPE STRIPLINE KICKER FOR THE APS-MBA UPGRADE
FAST INJECTION SYSTEM R&D FOR THE APS UPGRADE
Test of very fast kicker for TESLA damping ring
Conference
·
Sun Jun 25 00:00:00 EDT 2017
·
OSTI ID:1393931
FAST INJECTION SYSTEM R&D FOR THE APS UPGRADE
Conference
·
Mon Jun 01 00:00:00 EDT 2015
·
OSTI ID:1335934
Test of very fast kicker for TESLA damping ring
Conference
·
Mon Mar 31 23:00:00 EST 1997
· Conf.Proc.C
·
OSTI ID:490475