The MBA upgrade for the APS will operate with bunch swap out and on axis injection. The planned 324 bunch fill pattern places difficult demands on the injection and extraction kickers. The present concept uses dual stripline kickers driven by high Voltage pulsers. Minimizing perturbation on adjacent bunches requires very fast rise and fall times with relatively narrow ~20 nsec, 15 kV pulses. To achieve these requirements we have initiated a multifaceted R&D program. The R&D includes the HV pulser, stripline kicker and HV feedthrough. We have purchased a commercial dual channel HV pulser and are evaluating its performance and reliability. In addition, we are investigating the feasibility of using nonlinear ferrite loaded coaxial cables (shockwave transmission line) to sharpen the leading and trailing edges of high voltage pulses. We are also developing a prototype kicker and high voltage feedthrough. The requirements for injection and extraction, progress on prototype development and results of our HV pulser investigations will be reported.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-06CH11357
OSTI ID:
1335934
Resource Relation:
Conference: 6th International Particle Accelerator Conference (IPAC 2015), 05/03/15 - 05/08/15, Richmond, VA
Country of Publication:
United States
Language:
English

Similar Records

PRELIMINARY TEST RESULTS OF A PROTOTYPE FAST KICKER FOR APS MBA UPGRADE
Conference · Sun Jun 25 00:00:00 EDT 2017 · OSTI ID:1335934

SIMULATION STUDIES OF A PROTOTYPE STRIPLINE KICKER FOR THE APS-MBA UPGRADE
Conference · Sun Jun 25 00:00:00 EDT 2017 · OSTI ID:1335934

DESIGN UPDATE ON THE HSR INJECTION KICKER FOR THE EIC
Conference · Sun Jun 26 00:00:00 EDT 2022 · OSTI ID:1335934

Related Subjects