skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: PRELIMINARY TEST RESULTS OF A PROTOTYPE FAST KICKER FOR APS MBA UPGRADE

Conference ·
DOI:https://doi.org/10.18429· OSTI ID:1389059

The APS multi-bend achromatic (MBA) upgrade storage ring plans to support two bunch fill patterns: a 48-bunch and a 324-bunch. A “swap out” injection scheme is required. In order to provide the required kick to injected beam, to minimize the beam loss and residual oscillation of injected beam, and to minimize the perturbation to stored beam during injection, the rise, fall, and flat-top parts of the kicker pulse must be within a 16.9-ns interval. Stripline-type kickers are chosen for both injection and extraction. We developed a prototype kicker that supports a ±15kV differential pulse voltage. We performed high voltage discharge, TDR measurement, high voltage pulse test and beam test of the kicker. We report the final design of the fast kicker and the test results.

Research Organization:
Argonne National Lab. (ANL), Argonne, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-06CH11357
OSTI ID:
1389059
Resource Relation:
Conference: 2016 North American Particle Accelerator Conference, 10/09/16 - 10/14/16, Chicago, IL, US
Country of Publication:
United States
Language:
English

Similar Records

SIMULATION STUDIES OF A PROTOTYPE STRIPLINE KICKER FOR THE APS-MBA UPGRADE
Conference · Sun Jun 25 00:00:00 EDT 2017 · OSTI ID:1389059

FAST INJECTION SYSTEM R&D FOR THE APS UPGRADE
Conference · Mon Jun 01 00:00:00 EDT 2015 · OSTI ID:1389059

BPM STABILTIY STUDIES FOR THE APS MBA UPGRADE
Conference · Sat Mar 25 00:00:00 EDT 2017 · OSTI ID:1389059