CPUC offers restructuring proposals for comment
Journal Article
·
· IEEE Power Engineering Review
OSTI ID:137111
California Public Utilities Commission (CPUC) president Daniel Wm. Fessler and commissioners P. Gregory Conlon and Henry M. Duque proposed to restructure California`s electric industry by virtual direct access through a voluntary wholesale pool with retail competition through physical, bilateral contracts not sooner than 2 years after the pool begins. Commissioner Jessie J. Knight, Jr. offered an alternative proposing consumer choice through direct access whereby consumers can enter directly into individual agreements with power producers. Fessler and Knight are coassigned commissioners for this proceeding. The CPUC will work with the legislature, governor, other western jurisdictions, and Federal Energy Regulatory Commission (FERC) to facilitate restructuring. This article examines these two views on how to restructure the electric power industry in California to foster competition and performance-based regulation.
- OSTI ID:
- 137111
- Journal Information:
- IEEE Power Engineering Review, Journal Name: IEEE Power Engineering Review Journal Issue: 8 Vol. 15; ISSN 0272-1724; ISSN IPERDV
- Country of Publication:
- United States
- Language:
- English
Similar Records
Collision or coexistence: The FERC, the CPUC, and electric restructuring
A summary of the California Public Utilities Commission`s two competing electric utility restructuring proposals
Reconfiguring a major utility: A western view
Journal Article
·
Sun Oct 01 00:00:00 EDT 1995
· Fortnightly
·
OSTI ID:196591
A summary of the California Public Utilities Commission`s two competing electric utility restructuring proposals
Technical Report
·
Tue Oct 31 19:00:00 EST 1995
·
OSTI ID:132711
Reconfiguring a major utility: A western view
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:530505