Yuzhno-sakhalin TET`s-1 modernization study. Volume 2. Export trade information
Technical Report
·
OSTI ID:118178
The study, conducted by Babcock and Wilcox, was funded by the U.S. Trade and Development Agency. The report shows the results of a feasibility study conducted to assess the rehabilitation of the Sakhalin TETs-1 thermal power station. The study includes the complete plant equipment and operations, and recommendation and budgetary pricing to upgrade to present standards. This is Volume 2 of the report and it contains the following sections: (B) Technical; (C) Commercial; (D) Socioeconomic Considerations; (E) Conclusions; (F) Survey of Electric Utilities in the Russian Far East.
- Research Organization:
- Babcock and Wilcox Co., Barberton, OH (United States)
- OSTI ID:
- 118178
- Report Number(s):
- PB--95-268660/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Yuzhno-sakhalin TET`s-1 modernization study. Volume 1. Export trade information
Repowering of lenenergo severnaya TETS-21 with lm6000 gas turbine. Export trade information
Ryazan power plant feasibility study. Volume 2. Export trade information
Technical Report
·
Mon May 01 00:00:00 EDT 1995
·
OSTI ID:118177
Repowering of lenenergo severnaya TETS-21 with lm6000 gas turbine. Export trade information
Technical Report
·
Tue Oct 31 23:00:00 EST 1995
·
OSTI ID:220380
Ryazan power plant feasibility study. Volume 2. Export trade information
Technical Report
·
Fri Jul 01 00:00:00 EDT 1994
·
OSTI ID:6620510