Design and construction of septum magnets at the 7-GeV APS.
Conference
·
OSTI ID:11147
The mechanical design, construction, and assembly procedure of six different septum magnet designs used in the Advanced Photon Source (APS) facility will be described. This will include a positron accumulator ring (PAR) AC septum magnet, a synchrotrons thin injection septum AC thin and thick extraction septa, and storage ring AC thick and thin injection septum magnets. Design parameters, material selection, assembly procedures, and operational results will be presented.
- Research Organization:
- Argonne National Lab., IL (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- W-31109-ENG-38
- OSTI ID:
- 11147
- Report Number(s):
- ANL/ASD/CP-97751
- Country of Publication:
- United States
- Language:
- English
Similar Records
A pulsed septum magnet for the APS
The APS direct-drive pulsed septum magnets
Circuit description of the power systems for pulsed septum magnets at APS
Conference
·
Thu Jul 01 00:00:00 EDT 1993
·
OSTI ID:10175282
The APS direct-drive pulsed septum magnets
Conference
·
Sat Jul 01 00:00:00 EDT 1995
·
OSTI ID:82018
Circuit description of the power systems for pulsed septum magnets at APS
Conference
·
Mon Dec 31 23:00:00 EST 1990
·
OSTI ID:5769906