Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Final Report DM1200 Tests with AZ-101 HLW Simulants

Technical Report ·
DOI:https://doi.org/10.2172/1034653· OSTI ID:1034653
 [1];  [1];  [1];  [1];  [1];  [1];  [2]
  1. The Catholic Univ. of America, Washington, DC (United States)
  2. USDOE Office of River Protection (ORP), Richland, WA (United States)
This report documents melter and off-gas performance results obtained on the DM 1200 HLW Pilot Melter during processing of simulated HLW AZ-101 feed. The principal objectives of the DM1200 melter testing were to determine the achievable glass production rates for simulated HLW AZ-101 feed; determine the effect of bubbling rate and feed solids content on production rate; characterize melter off-gas emissions; characterize the performance of the prototypical off-gas system components as well as their integrated performance; characterize the feed, glass product, and off-gas effluents; and to perform pre- and post-test inspections of system components. The test objectives (including test success criteria), along with how they were met, are outlined in a table.
Research Organization:
Hanford Site (HNF), Richland, WA (United States); USDOE Office of River Protection (ORP), Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Management (EM)
DOE Contract Number:
AC27-08RV14800
OSTI ID:
1034653
Report Number(s):
ORP--51440-Rev-0; VSL-03R3800-4 Rev. 0, 2/17/2004
Country of Publication:
United States
Language:
English