Integrated DM1200 Melter Testing of HLW AZ-102 Composition Using Bubblers (Final Report)
- The Catholic Univ. of America, Washington, DC (United States)
This report documents melter and off-gas performance results obtained on the DM1200 HLW Pilot Melter during processing of simulated HLW AZ-102 feed. The principal objectives of the DM1200 melter testing were to determine the achievable glass production rates for simulated HLW AZ-102 feed; determine the effect of bubbling rate on production rate; characterize melter off-gas emissions; characterize the performance of the prototypical off-gas system components as well as their integrated performance; characterize the feed, glass product, and off-gas effluents; and to perform pre- and post test inspections of system components.
- Research Organization:
- Hanford Site (HNF), Richland, WA (United States); USDOE Office of River Protection (ORP), Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Management (EM)
- DOE Contract Number:
- AC27-01RV14136
- OSTI ID:
- 2473621
- Report Number(s):
- ORP--70888-Rev.0; VSL-03R3800-2; VSL-03R3800-2, Rev. 0
- Country of Publication:
- United States
- Language:
- English
Similar Records
Integrated DM1200 Melter Testing of HLW C-106/AY-102 Composition Using Bubblers
Final Report DM1200 Tests with AZ-101 HLW Simulants
Final Report Integrated DM1200 Melter Testing Using AZ-102 and C-106/AY-102 HLW Simulants: HLW Simulant Verification
Technical Report
·
Wed Dec 28 19:00:00 EST 2011
·
OSTI ID:1034652
Final Report DM1200 Tests with AZ-101 HLW Simulants
Technical Report
·
Wed Dec 28 19:00:00 EST 2011
·
OSTI ID:1034653
Final Report Integrated DM1200 Melter Testing Using AZ-102 and C-106/AY-102 HLW Simulants: HLW Simulant Verification
Technical Report
·
Wed Dec 28 19:00:00 EST 2011
·
OSTI ID:1034657