Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

D0 Silicon Upgrade: D0 Central Tracking Solenoid: Specification for Solenoid Energization, controls, Interlocks and Quench Protection

Technical Report ·
DOI:https://doi.org/10.2172/1033313· OSTI ID:1033313
This document has served as the specification for the energization, control, interlocking and quench protection systems for the DZERO superconducting solenoid installation. This does not include the cryogenics system. As the work proceeded, the details of the design were 'fleshed out' such that this document ultimately describes the system 'as built'. See 'Revisions to this document' for a description of all changes incorporated since the initial date. These changes have been integrated into this document; but are listed separately for historical reference. The basis for this specification is the FERMILAB-TM-1886, May 13, 1994: 'Conceptual Design of a 2 Tesla Superconducting Solenoid for the Fermilab DO Detector Upgrade', Chapter 9, 'Control and Instrumentation'; and Chapter 10, 'DC Energization Circuit'. This spec. has provided a stationary target for final design; and a central source of reference to the finished system.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
DOE Office of Science
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1033313
Report Number(s):
FERMILAB-D0-EN-418
Country of Publication:
United States
Language:
English