D0 Central Tracking Solenoid Energizatino, Controls, Interlocks and Quench Protection Initial Validation Procedures
This note presents the inspection and tests to be performed on the DZERO solenoid energization, controls, interlocks and quench protection system before it is energized for the first time. This test is to be performed with a 5000A jumper at the end of the bus instead of the solenoid. This system is based in DZERO room 511. A copy of this note shall be annotated, signed and dated by the person coordinating the procedure; and filed with the system maintenance records. Annotations shall include comments about any aspect of the procedure that is abnormal or unsuccessful. The following inspections and tests shall be performed by persons knowledgeable about the system. Each individual test step should be reviewed and understood before proceeding with that step.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL
- Sponsoring Organization:
- DOE Office of Science
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1032085
- Report Number(s):
- FERMILAB-D0-EN-525
- Country of Publication:
- United States
- Language:
- English
Similar Records
D0 Central Tracking Solenoid Energization, Controls, Interlocks and Quench Protection Operating Procedures
D0 Silicon Upgrade: D0 Central Tracking Solenoid: Specification for Solenoid Energization, controls, Interlocks and Quench Protection
D0 Silicon Upgrade: D-Zero silicon Cooling System Monitoring, Interlocks, & Alarms
Technical Report
·
Wed Aug 26 00:00:00 EDT 1998
·
OSTI ID:1032084
D0 Silicon Upgrade: D0 Central Tracking Solenoid: Specification for Solenoid Energization, controls, Interlocks and Quench Protection
Technical Report
·
Mon Jan 16 23:00:00 EST 1995
·
OSTI ID:1033313
D0 Silicon Upgrade: D-Zero silicon Cooling System Monitoring, Interlocks, & Alarms
Technical Report
·
Tue Nov 06 23:00:00 EST 2001
·
OSTI ID:1481390