Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

D0 Silicon Upgrade: D-Zero silicon Cooling System Monitoring, Interlocks, & Alarms

Technical Report ·
DOI:https://doi.org/10.2172/1481390· OSTI ID:1481390
 [1]
  1. Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

This engineering note describes the Monitoring, Interlock, and Alarm systems used to operate the Dzero Silicon Cooling System and the Silicon Dry Air Purge System. The actual software programming is not included in this document, but the programming actions and interactions are included.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1481390
Report Number(s):
FERMILAB--D0-EN-548; 1084893
Country of Publication:
United States
Language:
English

Similar Records

D-Zero Silicon Cooling System Moisture Injection System Control System
Technical Report · Wed Sep 02 00:00:00 EDT 2009 · OSTI ID:1462251

D0 Silicon Upgrade: Overview of the D-Zero Silicon Detector Purge Air System
Technical Report · Wed Dec 27 23:00:00 EST 2000 · OSTI ID:1481386

D0 Silicon Upgrade: D0 Central Tracking Solenoid: Specification for Solenoid Energization, controls, Interlocks and Quench Protection
Technical Report · Mon Jan 16 23:00:00 EST 1995 · OSTI ID:1033313