D0 Solenoid Upgrade Project: Thermal Contraction Analysis for the D0 Solenoid Chimney
This engineering note documents the thermal contraction analysis that was done for the D-Zero solenoid chimney. The analysis was done as support of the 'Design Report of the 2 Tesla Superconducting Solenoid for the Fermilab DO Detector upgrade.' The cryogenic LHE and LN2 lines were analyzed for combined pressure, thermal movement, and dead weight. The tubing was stress analyzed per ASME code for Pressure Piping, standard ANSI AS:ME B31.3, for eight combinations ofthermal loading. A commercial pipe stress analysis and design system by Algor{reg_sign} was used for the analysis. Stresses calculated were well below allowables. Based on the analysis, the cryogenic lines will be installed at an offset from the vacuum jacket centerline so that during steady state cold operation, the cryogenic lines will be in a proper location.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL
- Sponsoring Organization:
- DOE Office of Science
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1031785
- Report Number(s):
- FERMILAB-D0-EN-349
- Country of Publication:
- United States
- Language:
- English
Similar Records
D0 Silicon Upgrade: Cryogenic Lines at Refrigerator: Thermal Contraction Analysis of Four Cryogenic Utility Lines for the D0 Upgrade
D0 Solenoid Upgrade Project: Heat Load Calculations for the Solenoid Chimney
D0 Solenoid Upgrade Project: Rectangular Liquid Helium Tube, Miscellaneous Information
Technical Report
·
Thu Jun 22 20:00:00 EDT 1995
·
OSTI ID:1033305
D0 Solenoid Upgrade Project: Heat Load Calculations for the Solenoid Chimney
Technical Report
·
Wed May 26 00:00:00 EDT 1993
·
OSTI ID:1031788
D0 Solenoid Upgrade Project: Rectangular Liquid Helium Tube, Miscellaneous Information
Technical Report
·
Wed May 26 00:00:00 EDT 1993
·
OSTI ID:1031789