Argon Spill Duct Bellows Leak Test Procedures and Results
This engineering note describes the testing of the argoll spill duct bellows. It includes a detailed explanation of the procedures, along with a summary of the results of the testing done on 2/18/91 and 2/19/91 by Gary Trotter. The original bellows were purchased from Expansion Joint Systems (see Appendix 2). The general conclusion from the testing was that the leaks that were found were small enough so that they would not show up at the design pressure of 0.1 psig. Therefore, the leaks were acceptable, and the conclusion was that the bellows were fit for use.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL
- Sponsoring Organization:
- DOE Office of Science
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1031802
- Report Number(s):
- FERMILAB-D0-EN-297
- Country of Publication:
- United States
- Language:
- English
Similar Records
Argon Spill Trough Bellows - Leak Test
BELLOWS EXPANSION JOINTS FOR GAS DUCTING
Load on Trough Bellows Following an Argon Spill
Technical Report
·
Mon Apr 30 00:00:00 EDT 1990
·
OSTI ID:1031843
BELLOWS EXPANSION JOINTS FOR GAS DUCTING
Journal Article
·
Sun Nov 30 23:00:00 EST 1958
· Nuclear Power
·
OSTI ID:4276944
Load on Trough Bellows Following an Argon Spill
Technical Report
·
Tue Jul 12 00:00:00 EDT 1988
·
OSTI ID:1031184