Load on Trough Bellows Following an Argon Spill

Technical Report ·
DOI:https://doi.org/10.2172/1031184· OSTI ID:1031184
In the case of a gross argon spill from the DO detector, the liquid argon is caught in three plenums. These plenums are to be connected by bellows to make a horizontal trough open at one end for removing the argon. The design of these bellows is dependent on the maximum argon load they must carry. Bellows to connect the three argon-catching plenums in the DO detector must be able to carry at least 92 lbs of argon when closed and 231 lbs when open, plus the load due to argon in the convolutions. Examples of such loads and the method for their calculations are contained in the Discussion. It should be noted that a set of assumptions was used in these calculations. First, we considered a uniform channel and uniform flow. Second, we used a value for Manning's n meant for a similar, but not exactly the same, case. Finally, we were forced to define an average depth, d, to be used to state the hydraulic radius, R, and area of flow, A. These facts may warrant consideration in future calculations.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
DOE Office of Science
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1031184
Report Number(s):
FERMILAB-D0-EN-167
Country of Publication:
United States
Language:
English

Similar Records

Argon Spill Trough Bellows - Leak Test
Technical Report · Mon Apr 30 00:00:00 EDT 1990 · OSTI ID:1031843

Oil well spill trough
Patent · Tue Jun 16 00:00:00 EDT 1992 · OSTI ID:7024389

Argon Spill Duct Bellows Leak Test Procedures and Results
Technical Report · Sun Mar 10 23:00:00 EST 1991 · OSTI ID:1031802