Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Radiochemistry for the rupture of a Zircaloy-2 clad, natural uranium thermocouple fuel element in KER-1

Technical Report ·
DOI:https://doi.org/10.2172/10168312· OSTI ID:10168312

During the 0000--0800 shift on August 21, 1960, the delayed neutron monitor on KER Loop 1 indicated a high coolant activity level. Sympathetic responses were also recorded on the Loop 2, 3 and 4 monitors indicating a possible fuel element failure in Loop 1. The KER Reactor began shutdown operations immediately thereafter. The purpose of this report is to summarize the events pertinent to this reactor outage and to discuss the results obtained from coolant and coupon samples taken from Loop 1.

Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10168312
Report Number(s):
HW--70521; ON: DE94015500
Country of Publication:
United States
Language:
English