Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Radiochemistry for the rupture of a Zircaloy-2 clad uranium fuel element in KER-1

Technical Report ·
DOI:https://doi.org/10.2172/10145365· OSTI ID:10145365

During the 0800--1600 shift on July 7, 1960, the delayed neutron monitor on KER Loop 1 indicated a high coolant activity level. Sympathetic responses were also recorded on the Loop 3 and Loop 4 instruments indicating a possible fuel element failure in Loop 1. The KE Reactor began shutdown operations immediately thereafter. The purpose of this report is to summarize the events pertinent to this reactor outage and to discuss the results obtained from coolant samples and a thermocouple wire sample taken from Loop 1.

Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10145365
Report Number(s):
HW--68550; ON: DE94010502
Country of Publication:
United States
Language:
English