Acceptance test report 2721-Z upgrades
This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE Assistant Secretary for Nuclear Energy, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 10148221
- Report Number(s):
- HNF-SD-C189-ATR-001; ON: DE99050487; BR: EW7002010; TRN: AHC29927%%74
- Resource Relation:
- Other Information: PBD: 3 Feb 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1
Project B610 process control configuration acceptance test procedure
Preliminary safety evaluation for the plutonium stabilization and packaging system
Technical Report
·
Tue Oct 24 00:00:00 EDT 1995
·
OSTI ID:10148221
Project B610 process control configuration acceptance test procedure
Technical Report
·
Tue Sep 20 00:00:00 EDT 1994
·
OSTI ID:10148221
Preliminary safety evaluation for the plutonium stabilization and packaging system
Technical Report
·
Fri Mar 14 00:00:00 EST 1997
·
OSTI ID:10148221