Preliminary safety evaluation for the plutonium stabilization and packaging system
This Preliminary Safety Evaluation (PSE) describes and analyzes the installation and operation of the Plutonium Stabilization and Packaging System (SPS) at the Plutonium Finishing Plant (PFP). The SPS is a combination of components required to expedite the safe and timely storage of Plutonium (Pu) oxide. The SPS program will receive site Pu packages, process the Pu for storage, package the Pu into metallic containers, and safely store the containers in a specially modified storage vault. The location of the SPS will be in the 2736- ZB building and the storage vaults will be in the 2736-Z building of the PFP, as shown in Figure 1-1. The SPS will produce storage canisters that are larger than those currently used for Pu storage at the PFP. Therefore, the existing storage areas within the PFP secure vaults will require modification. Other modifications will be performed on the 2736-ZB building complex to facilitate the installation and operation of the SPS.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 324941
- Report Number(s):
- HNF-SD-W460-PSE-001; ON: DE98059676; BR: EX7002010; CNN: DE-AC06-96RL13200; TRN: 99:003693
- Resource Relation:
- Other Information: PBD: 14 Mar 1997
- Country of Publication:
- United States
- Language:
- English
Similar Records
Plutonium Finishing Plant (PFP) 241-Z Liquid Waste Treatment Facility Deactivation and Demolition
Plutonium stabilization and handling (PuSH)