Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Conceptual design report, plutonium stabilization and handling,project W-460

Technical Report ·
DOI:https://doi.org/10.2172/330712· OSTI ID:330712

Project W-460, Plutonium Stabilization and Handling, encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM for up to fifty years. This Conceptual Design Report (CDR) provides conceptual design details for the vault modification, site preparation and site interface with the purchased SPS. Two concepts are described for vault configuration; acceleration of this phase of the project did not allow completion of analysis which would clearly identify a preferred approach.

Research Organization:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
330712
Report Number(s):
HNF-SD-W460-CDR--001; ON: DE98059651; BR: EW7003000; CNN: DE-AC06-96RL13200
Country of Publication:
United States
Language:
English

Similar Records

Plutonium stabilization and handling (PuSH)
Technical Report · Wed Jan 22 23:00:00 EST 1997 · OSTI ID:325828

Plutonium stabilization and handling quality assurance program plan
Technical Report · Wed Apr 22 00:00:00 EDT 1998 · OSTI ID:362379

Functional Design Criteria plutonium stabilization and handling (PUSH) project W-460
Technical Report · Thu Sep 02 00:00:00 EDT 1999 · OSTI ID:798084