skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Acceptance test report 2721-Z upgrades

Technical Report ·
DOI:https://doi.org/10.2172/10148221· OSTI ID:10148221

This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing.

Research Organization:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE Assistant Secretary for Nuclear Energy, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
10148221
Report Number(s):
HNF-SD-C189-ATR-001; ON: DE99050487; BR: EW7002010; TRN: AHC29927%%74
Resource Relation:
Other Information: PBD: 3 Feb 1998
Country of Publication:
United States
Language:
English