skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Toms Creek integrated gasification combined cycle demonstration project. Quarterly report, April 1--June 30, 1993

Technical Report ·
DOI:https://doi.org/10.2172/10133367· OSTI ID:10133367

The quarterly technical progress report for the period ending June 30, 1993, summarizes the work done to date by Tampella Power Corporation and Enviropower, Inc. Enviropower Inc.`s efforts were concentrated on the Toms Creek PDS (Preliminary Design and Studies). Tampella Power Corporation`s efforts were concentrated on site specific heat and material balances to provide the basis for evaluating alternate locations for the Project. Enviropower, Inc. is nearing completion of the PDS (Preliminary Design and Studies). The status of the design of the equipment for the Gasifier Island, not covered in the previous technical progress report, is given.

Research Organization:
TAMCO Power Partners, Williamsport, PA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
FC21-93MC29444
OSTI ID:
10133367
Report Number(s):
DOE/MC/29444-3653; ON: DE94004073; BR: AZ0601010
Resource Relation:
Other Information: PBD: Sep 1993
Country of Publication:
United States
Language:
English