Toms Creek IGCC Demonstration Project
The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020{degree}F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.
- Research Organization:
- TAMCO Power Partners, Marietta, GA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- FC21-93MC29444
- OSTI ID:
- 10106917
- Report Number(s):
- DOE/MC/29444-93/C0085; CONF-920951-10; ON: DE93002743
- Resource Relation:
- Conference: 12. annual gasification and gas stream cleanup systems contractors review meeting,Morgantown, WV (United States),15-17 Sep 1992; Other Information: PBD: [1992]
- Country of Publication:
- United States
- Language:
- English
Similar Records
Toms Creek IGCC Demonstration Project
Toms Creek IGCC Demonstration Project. Comprehensive report to Congress, Clean coal technology program
Related Subjects
01 COAL, LIGNITE, AND PEAT
COAL GASIFICATION
DEMONSTRATION PROGRAMS
HOT GAS CLEANUP
COMBINED-CYCLE POWER PLANTS
U-GAS PROCESS
CHEMICAL REACTORS
FLUIDIZED BEDS
VIRGINIA
BITUMINOUS COAL
GAS TURBINES
FLOWSHEETS
200102
010404
010402
POWER CYCLES
GASIFICATION
PURIFICATION AND UPGRADING