Toms Creek IGCC Demonstration Project. Comprehensive report to Congress, Clean coal technology program
Technical Report
·
OSTI ID:10177686
In response to the PON, 33 proposals were received by DOE in May 1991. One of the nine is a project proposed by Tampella Power Corporation (Tampella) and Coastal Power Production Company (Coastal) for the design, construction, and operation of a pressurized, air-blown, fluidized-bed, integrated gasification, combined-cycle, (IGCC) demonstration project. The project, entitled the Toms Creek IGCC Demonstration Project, will consume 430 tons per day of bituminous coal and generate 55 megawatts (MK) of power for the electric grid and steam for use in a nearby coal preparation plant. The project site is located near Coeburn in Wise County, Virginia. The project, including the demonstration phase, will last 99 months at a total cost of $196,570,000. DOE`S share of the project cost will be 48.3%, or $95,000,000. The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, pressurized fluidized-bed U-Gas gasifier developed by the Institute of Gas Technology (IGT) with in-bed desulfurization using a calcium-based sorbent and an external zinc titanate sulfur removal system.
- Research Organization:
- USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States). Office of Clean Coal Technology
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- OSTI ID:
- 10177686
- Report Number(s):
- DOE/FE--0264P; ON: DE93000960; NC: NONE
- Country of Publication:
- United States
- Language:
- English
Similar Records
Toms Creek IGCC Demonstration Project
Toms Creek IGCC Demonstration Project
Toms Creek IGCC Demonstration Project
Technical Report
·
Tue Sep 01 00:00:00 EDT 1992
·
OSTI ID:7022841
Toms Creek IGCC Demonstration Project
Conference
·
Tue Dec 31 23:00:00 EST 1991
·
OSTI ID:7146532
Toms Creek IGCC Demonstration Project
Conference
·
Sat Oct 31 23:00:00 EST 1992
·
OSTI ID:10106917
Related Subjects
01 COAL, LIGNITE, AND PEAT
010402
010404
20 FOSSIL-FUELED POWER PLANTS
200102
AIR
BITUMINOUS COAL
COAL GASIFICATION
COMBINED-CYCLE POWER PLANTS
DEMONSTRATION PROGRAMS
DESULFURIZATION
FLUIDIZED BEDS
FUEL GAS
GAS TURBINES
GASIFICATION
HOT GAS CLEANUP
LOW BTU GAS
POWER CYCLES
PRESSURIZATION
PURIFICATION AND UPGRADING
STEAM
STEAM TURBINES
TITANATES
U-GAS PROCESS
US CLEAN COAL TECHNOLOGY PROGRAM
ZINC COMPOUNDS
010402
010404
20 FOSSIL-FUELED POWER PLANTS
200102
AIR
BITUMINOUS COAL
COAL GASIFICATION
COMBINED-CYCLE POWER PLANTS
DEMONSTRATION PROGRAMS
DESULFURIZATION
FLUIDIZED BEDS
FUEL GAS
GAS TURBINES
GASIFICATION
HOT GAS CLEANUP
LOW BTU GAS
POWER CYCLES
PRESSURIZATION
PURIFICATION AND UPGRADING
STEAM
STEAM TURBINES
TITANATES
U-GAS PROCESS
US CLEAN COAL TECHNOLOGY PROGRAM
ZINC COMPOUNDS