Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Flow protection trip limits operational charge-discharge facility -- C Reactor

Technical Report ·
DOI:https://doi.org/10.2172/10108354· OSTI ID:10108354
Because of wide variations in the venturi throat pressure, well beyond the panellit gage trip range, that occur during the sequence of operational charge-discharge, the panellit gage cannot be included in the scram safety circuit during the period of time that charge- discharge operations are being performed. In its stead, the function of the panellit gage is replaced in an overlapping manner by a tube inlet pressure monitor that is equipped with high and low pressure trip mechanisms that may be included in the scram safety circuit during the time that the panellit gage must be by-passed. The tube inlet pressure monitor is then used to provide the protection from unstable flow that is normally obtained with the panellit gage. This memorandum describes the manner in which the tube inlet pressure monitor trip points are to be determined and used.
Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10108354
Report Number(s):
HW--64415; ON: DE93003943
Country of Publication:
United States
Language:
English