C Reactor reorificing analysis
during the December 1953 extended outage the process water flow at C Reactor was increased and redistributed to allow reactor operation with a 69 tube enrichment ring in the third lattice unit and with the maximum protection afforded by the trip before boiling operational concept. The redistribution was accomplished by the installation of individual venturi flow meters on approximately 1800 process tubes. Flow and pressure requirements were met by the installation of larger diameter conventional Hanford orifices on about 200 tubes. During the outage, the original Panellit gages were replaced with improved Panellit gages equipped with long vane mercoid switches. The purpose of this memorandum is to review and report the results of the reorificing program and to compare them with predicted behavior.
- Research Organization:
- Hanford Atomic Products Operation, Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10137607
- Report Number(s):
- HW--30473; ON: DE93009978
- Country of Publication:
- United States
- Language:
- English
Similar Records
Flow protection trip limits operational charge-discharge facility -- C Reactor
Effects of 100-K water plant expansion on Panellits and orifices
Personal notes [of D.S. Lewis, 7 September 1956 to 31 December 1959]
Technical Report
·
Fri Sep 19 00:00:00 EDT 1958
·
OSTI ID:10108354
Effects of 100-K water plant expansion on Panellits and orifices
Technical Report
·
Tue Dec 01 23:00:00 EST 1959
·
OSTI ID:10171793
Personal notes [of D.S. Lewis, 7 September 1956 to 31 December 1959]
Technical Report
·
Fri Sep 07 00:00:00 EDT 1956
·
OSTI ID:10173111