Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.
- Pacific States Marine Fisheries Commission
In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installation of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.
- Research Organization:
- Bonneville Power Administration (BPA), Portland, OR (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- 35682
- OSTI ID:
- 962410
- Report Number(s):
- P111401; R&D Project: 2001-003-00; TRN: US200916%%245
- Resource Relation:
- Related Information: document dated April 9, 2009
- Country of Publication:
- United States
- Language:
- English
Similar Records
Comparative Survival [Rate] Study (CSS) of Hatchery PIT-tagged Chinook; Migration Years 1996-1998 Mark/Recapture Activities, 2000 Annual Report.
Radio-Tracking Studies of Adult Chinook Salmon and Steelhead to Determine the Effect of ''Zero'' River Flow During Water Storage at Little Goose Dam on the Lower Snake River, Final Report of Research.