Final Report - Independent Confirmatory Survey Summary and Results for the Hematite Decommissioning Project
The objectives of the confirmatory surveys were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the licensee’s procedures and survey results.
- Research Organization:
- Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- DE-AC05-06OR23100
- OSTI ID:
- 959376
- Report Number(s):
- ORISE 1768-SR-01-0; TRN: US0904397
- Country of Publication:
- United States
- Language:
- English
Similar Records
Independent Confirmatory Survey Summary and Results for the Plum Brook Reactor Facility Sandusky OH
Final Report-Confirmatory Survey Results for the ABB Combustion Engineering Site, Windsor, Connecticut; Revision 1 (DCN 5158-SR-02-1) (Docket No. 030-03754; RFTA No. 12-003)
"CONFIRMATORY SURVEY RESULTS FOR THE ABB COMBUSTION ENGINEERING SITE WINDSOR, CONNECTICUT DCN 5158-SR-02-2
Technical Report
·
Tue May 06 00:00:00 EDT 2008
·
OSTI ID:959376
Final Report-Confirmatory Survey Results for the ABB Combustion Engineering Site, Windsor, Connecticut; Revision 1 (DCN 5158-SR-02-1) (Docket No. 030-03754; RFTA No. 12-003)
Technical Report
·
Mon Jan 28 00:00:00 EST 2013
·
OSTI ID:959376
"CONFIRMATORY SURVEY RESULTS FOR THE ABB COMBUSTION ENGINEERING SITE WINDSOR, CONNECTICUT DCN 5158-SR-02-2
Technical Report
·
Mon Mar 25 00:00:00 EDT 2013
·
OSTI ID:959376