Title: DIAGNOSIS, ANALYSIS, AND RESOLUTION OF THERMAL STABILITY ISSUES WITH HOM COUPLERS ON PROTOTYPE CEBAF SRF CAVITIES

Conference ·
OSTI ID:923384

During initial testing of the prototype cavities incorporated into the developmental cryomodule Renascence severe thermal stability issues were encountered during CW operation. Additional diagnostic instrumentation was added. This enabled identification of an unanticipated thermal impedance between the HOM coupler probe feedthrough assembly and the cavity beamtube. Subsequent detailed FE analysis successfully modeled the situation and indicated the need for alternate cooling path for the couplers on those cavities. HOM damping was measured to be adequate employing only two of the four HOM couplers. The two pickup probes on the couplers at the input power coupler side of each cavity were removed, the remaining HOM probe feedthroughs were heat stationed to two-phase helium supply piping, and a novel heat sink was added to station both the inner and outer conductors of the remaining HOM rf cables. The characterization measurements, analysis, modifications, and resulting performance are presented.

Research Organization:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC05-06OR23177
OSTI ID:
923384
Report Number(s):
JLAB-ACC-07-788; DOE/OR/23177-0309; TRN: US0801784
Resource Relation:
Conference: 13th Workshop on RF Superconductivity, Beijing, China, Oct. 14 - 19, 2007