An 8 GeV H- multi-turn injection system for the Fermilab Main Injector
Conference
·
OSTI ID:917828
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 917828
- Report Number(s):
- FERMILAB-CONF-07-287-AD
- Resource Relation:
- Conference: Presented at Particle Accelerator Conference (PAC 07), Albuquerque, New Mexico, 25-29 Jun 2007
- Country of Publication:
- United States
- Language:
- English
Similar Records
An 8 GeV H- multi-turn injection system for the Fermilab Main Injector
A Conceptual Design of an Internal Injection Absorber of 8 GeV H-Injection into the Fermilab Main Injector
A Conceptual Design of an Internal Injection Absorber of 8 GeV H-Injection into the Fermilab Main Injector
Conference
·
Fri Jun 01 00:00:00 EDT 2007
· Conf.Proc.C070625:1700,2007
·
OSTI ID:917828
+2 more
A Conceptual Design of an Internal Injection Absorber of 8 GeV H-Injection into the Fermilab Main Injector
Conference
·
Fri Jun 01 00:00:00 EDT 2007
·
OSTI ID:917828
A Conceptual Design of an Internal Injection Absorber of 8 GeV H-Injection into the Fermilab Main Injector
Conference
·
Fri Jun 01 00:00:00 EDT 2007
· Conf.Proc.C070625:1694,2007
·
OSTI ID:917828