skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Plutonium Immobilization Can Loading Conceptual Design

Technical Report ·
DOI:https://doi.org/10.2172/8591· OSTI ID:8591

'The Plutonium Immobilization Facility will encapsulate plutonium in ceramic pucks and seal the pucks inside welded cans. Remote equipment will place these cans in magazines and the magazines in a Defense Waste Processing Facility (DWPF) canister. The DWPF will fill the canister with glass for permanent storage. This report discusses the Plutonium Immobilization can loading conceptual design and includes a process block diagram, process description, preliminary equipment specifications, and several can loading issues. This report identifies loading pucks into cans and backfilling cans with helium as the top priority can loading development areas.'

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC09-96SR18500
OSTI ID:
8591
Report Number(s):
WSRC-TR-98-00229; ON: DE00008591
Country of Publication:
United States
Language:
English

Similar Records

Plutonium Immobilization Can Loading Conceptual Design
Technical Report · Thu May 13 00:00:00 EDT 1999 · OSTI ID:8591

Plutonium Immobilization Can Loading Concepts
Technical Report · Fri May 01 00:00:00 EDT 1998 · OSTI ID:8591

Plutonium Immobilization Can Loading Conceptual Design for 13 MT Case
Technical Report · Wed Jan 31 00:00:00 EST 2001 · OSTI ID:8591