skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operations and Maintenance, 2002 Annual Report.

Technical Report ·
DOI:https://doi.org/10.2172/841602· OSTI ID:841602
; ;  [1]
  1. Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR

The Catherine Creek Acclimation Facility (CCAF) received 180,912 smolts from LFH. The size of the fish at delivery was 18.4 fish/lb. Volitional releases started 1 April 2002 with a total of 7,998 PIT-tagged fish (68,948 estimated total fish) migrating from the raceways during the volitional release period. Hourly detections of PIT-tagged fish showed that most of the fish left between 1400 and 2200 hours. The size of the fish remaining just before the forced release was 16.4 fish/lb. The total mortality for the acclimation period was 569 (0.3 %). No significant mortality related to disease was observed. The fish were fed a total of 1,968 lbs of food for the acclimation period. The total number of fish released from the acclimation facility in 2002 was 180,343. The Upper Grande Ronde Acclimation Facility (UGRAF) received 201,958 smolts from LFH. The size of the fish at delivery was 17.4 fish/lb. On 3 March 2002 the water inflow to raceway 4 froze in the early morning hours and the entire raceway was lost. Volitional releases started 1 April 2002 with a total of 682 PIT-tagged fish (68,200 estimated total fish) migrating from the raceways during the volitional release period. Hourly detections of PIT-tagged fish showed that most of the fish left between 1500 and 2200 hours. The size of the fish left in the raceways just before the forced release was 18.3 fish/lb. The total mortality for the acclimation period not including raceway 4 was 402 (0.3 %). No significant mortality related to disease was observed. The fish were fed a total of 568 lbs of food for the acclimation period. The total number of fish released from the acclimation facility in 2002 was 151,444. Maintenance and repair activities were conducted at the acclimation facilities in 2002. Facility maintenance work consisted of snow removal, painting of building, installation of backup water supply system, construction of steps to intake area, improvements to raceway standpipes, removal of gravel from intake area, and complete overhaul of 2 travel trailers. Montgomery-Watson-Harza (MWH) completed construction activities to both acclimation facilities and the Catherine Creek Adult Collection Facility (CCACF) in 2002. Their work included installation of larger intake manifold, new inflow valves on each raceway, new manifold blowout valve, and handrails and grating around raceways and the weir.

Research Organization:
Confederated Tribes of the Umatilla Indian Reservation
Sponsoring Organization:
United States. Bonneville Power Administration.
DOE Contract Number:
00006509
OSTI ID:
841602
Report Number(s):
DOE/BP-00006509-4; R&D Project: 199800703; TRN: US200516%%1456
Country of Publication:
United States
Language:
English