HOM damping performance of JLAB SL21 cryomodule
The new SL21 cryomodule is the first 70MeV, 8-cavity string superconducting accelerator module to be installed in CEBAF. Each cavity has 7-cells, the center cells have Mark II shape and the end cells have the Mark III shape. The HOM couplers resemble the DESY welded type; two of them assembled at one end of a cavity outside of tuner hub, with 115{sup o} azimuthal apart. There is a {lambda}/4 stub fundamental power waveguide at other end of cavity. The first two passbands of TE111 and TM110 modes have to be damped to avoid beam breakup (BBU) problem at 460{micro}A current. External Q's of the HOM couplers and waveguide were measured on a copper model, on cold niobium cavities and finally in the cryomodule test without beam. This paper presents all HOM data associated with this structure. A threshold current calculated by MATBBU based on the real beam optics and HOM spectrums will be discussed. This information will also benefit next or a high beam current FEL cryomodule HOM.
- Research Organization:
- Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 824824
- Report Number(s):
- JLAB-ACC-03-220; DOE/ER/40150-2728; TRN: US0402230
- Resource Relation:
- Conference: Particle Accelerator Conference (PAC 03), Portland, OR (US), 05/12/2003--05/16/2003; Other Information: PBD: 1 May 2003
- Country of Publication:
- United States
- Language:
- English
Similar Records
Concepts for the JLab Ampere-Class CW Cryomodule
HIGH ORDER MODES SURVEY AND MITIGATION OF THE CEBAF C100 CRYOMODULES