skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: T Plant overpack tiedown analysis

Technical Report ·
DOI:https://doi.org/10.2172/759292· OSTI ID:759292

This tiedown evaluation meets the requirement imposed by HNF-6550, Safety Evaluation for Packaging (Onsite) T Plant Canyon Items, (O'Brien 2000). O'Brien (2000) requires that any items prepared for shipment from T Plant to the burial grounds that are not bounded by the analysis in O'Brien (2000) must have a separate, approved, engineered tiedown analysis. The width of the overpack box is 9 ft. 7 in. This width is wider than the maximum width authorized in O'Brien (2000), which is 8 ft.

Research Organization:
Hanford Site (HNF), Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Management (EM)
DOE Contract Number:
DE-AC06-96RL13200
OSTI ID:
759292
Report Number(s):
HNF-6743 Rev 0; EDT-628170
Country of Publication:
United States
Language:
English