skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: LWR Fuel Recycle Program. Quarterly progress report, April--June 1976. [Head end processes, off-gas treatment, Purex Process]

Technical Report ·
DOI:https://doi.org/10.2172/7348252· OSTI ID:7348252

Work was begun on the initial task of estimating U/sub 3/O/sub 8/ supply 1 prices. In the spent fuel receipt and storage project, review of existing and planned process equipment and concepts was initiated through discussions with both laboratory and industry personnel and through plant visits. Effort was also initiated to catalog existing fuel designs. Available information was reviewed on the voloxidation process and on various pyrochemical and pyrometallurgical steps for fuel reprocessing application. Further development work was done in the off-gas treatment project using charcoal filters to capture low concentrations of TBP vapor and x-ray fluorescence to analyze for phosphorus. A series of standards was prepared and is being analyzed. Several inorganic sorbent materials have been received and will be used in initial screening tests to determine TBP removal efficiency. Commercially available macroreticular polymeric adsorbents and anion exchange resins for the removal of iodine from dilute nitric acid streams (simulating concentrator overheads condensate) are being tested with encouraging results being obtained. The major portion of the literature search on solvent extraction equipment alternatives was completed, and a bibliographic listing of approximately 1000 items was generated. In the removal and re-entrainment of plutonium and other radionuclides project, a literature search was conducted to provide parameterizations for the draft Environmental Impact Statement for the LWR--Model Fuel Recycle Facilities. Recommended procedures are to ignore deposition and resuspension when calculating direct and inhalation doses; use Gaussian plume models only out to distances where sigma/sub z/ = h/2, then use the mixing height h out to 24-hr travel time, and thereafter use a constant mixing ratio; for calculating the indirect dose use a total (wet plus dry) deposition velocity of 3 cm/sec for reactive gases and all particles, regardless of size. (LK)

Research Organization:
Battelle Pacific Northwest Labs., Richland, WA (United States)
DOE Contract Number:
E(45-1)-1830
OSTI ID:
7348252
Report Number(s):
BNWL-2080-1
Country of Publication:
United States
Language:
English