skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Design considerations for a large aperture high field superconducting dipole

Conference ·
OSTI ID:6296107

The final phase of the Fermilab upgrade proposal calls for a new ring of superconducting magnets to be placed in the existing Main Accelerator tunnel. The goal of this design study is to specify a high field dipole (HFD) that is capable of supporting fixed target operation (ramping, resonant extraction) at a field of 6.6T (1.5 Tev) and colliding beam physics at 8.0T (1.8 Tev). The magnetic field quality at high field is set by the large amplitude orbits associated with resonant extraction. The field quality must therefore be at least as good as the existing Tevatron magnets which fulfill these criteria. The high fields and large aperture of this magnet result in large forces on the coil and collar assemblies. Therefore, the cold mass design must be able to sustain these forces while providing sufficient cooling to the coils during 4.2 K fixed target operation, and a minimum heat load during 1.8 K collider operation. The design work is still in progress but a cosine-theta, cold-iron dipole with a 70mm inner diameter coil has been tentatively adopted. This report presents details on the conductor and cable parameters, coil cross-section, projected manufacturing tolerances, iron yoke design, and cold mass assembly. 4 refs., 5 figs., 1 tab.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
6296107
Report Number(s):
FNAL-TM-1584; CONF-890335-123; ON: DE89011292
Resource Relation:
Conference: 13. particle accelerator conference, Chicago, IL, USA, 20 Mar 1989; Other Information: Paper copy only, copy does not permit microfiche production
Country of Publication:
United States
Language:
English