Raft River 5-MW(e) geothermal pilot plant project
Conference
·
OSTI ID:5195726
The Raft River 5-MW(e) Pilot Plant Project was started in 1976. Construction is scheduled for completion in July 1980, with three years of engineering and operational testing to follow. The plant utilized a 280/sup 0/F geothermal fluid energy source and a dual boiling isobutane cycle. Developmental efforts are in progress in the areas of down hole pumps and chemical treatment of geothermal fluid for cooling tower makeup.
- Research Organization:
- EG and G Idaho, Inc., Idaho Falls (USA)
- DOE Contract Number:
- AC07-76ID01570
- OSTI ID:
- 5195726
- Report Number(s):
- CONF-800920-8
- Resource Relation:
- Conference: Geothermal Resource Council annual meeting, Salt Lake City, UT, USA, 9 Sep 1980
- Country of Publication:
- United States
- Language:
- English
Similar Records
Raft River 5-MW(e) geothermal pilot plant
Quick look report on the startup tests for the Raft River 5-MW(e) pilot geothermal power plant
5 MW(e) Raft River pilot plant description and operation
Conference
·
Tue Jan 01 00:00:00 EST 1980
·
OSTI ID:5195726
Quick look report on the startup tests for the Raft River 5-MW(e) pilot geothermal power plant
Technical Report
·
Tue Dec 01 00:00:00 EST 1981
·
OSTI ID:5195726
5 MW(e) Raft River pilot plant description and operation
Journal Article
·
Mon Feb 01 00:00:00 EST 1982
· Bull., Geotherm. Resour. Counc. (Davis, Calif.); (United States)
·
OSTI ID:5195726