skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Solvent Refined Coal (SRC) process. [Runs 49 to 57 and 59 to 62]

Technical Report ·
DOI:https://doi.org/10.2172/5090549· OSTI ID:5090549

This report summarizes the progress of the Solvent Refined Coal (SRC) project for the period January 1, 1979 through December 31, 1979. The fourth quarter of 1979 is reported here in detail. Turnaround activities at the Fort Lewis SRC-II Pilot Plant were completed. During the shutdown, installation of Slurry Preheater B was completed. In addition, extensive modifications were completed to improve operability and slurry handling capabilities. The experimental program for testing Slurry Preheater B was revised to improve the data base for design scale-up considerations. Coal feed was established using Powhatan No. 6 coal. Twenty slurry survey tests were designed to establish the effects of varous slurry and heater inlet hydrogen flow rates on heat transfer, heater coil pressure drop, and heater operability. Additional tests were also added to the preheater evaluation program to study the effects of coal concentration, recycle pyridine insoluble concentration and preheater outlet temperatures. During 1979, PDU P-99 completed 13 runs (Runs 49 to 57 and 59 to 62). All these runs were made feeding coal from the Powhatan No. 5 Mine.

Research Organization:
Pittsburg and Midway Coal Mining Co., Englewood, CO (USA)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC01-76ET10104
OSTI ID:
5090549
Report Number(s):
DOE/ET/10104-T4(Vol.1)
Country of Publication:
United States
Language:
English